Home › Blog › Retail shell to restaurant
Case Studies

Retail shell to restaurant

The white box was Group M. The dining room is not.

InstaPreView · Published November 12, 2026 · Updated November 12, 2026
Line drawing of a tenant floor plan with demising walls and one suite outlined, titled “Retail shell to restaurant”. InstaPreView by Byts & Bytes.

The landlord delivered a retail shell. The tenant is a restaurant. That is not a fixture package inside Group M. It is a change of occupancy, a commercial kitchen, and a health permit, and each of those can reject the set on its own.

Classification is IBC Chapter 3. A dining room with food and drink is commonly Group A-2. The existing explanation of occupancy on this site notes that Section 303.1.2 can classify a small assembly space as Group B below a threshold. Confirm that section in the adopted code before you use it. If you are over the threshold, say Group A-2 on the code sheet and follow assembly rules. The occupancy guide and the change of occupancy guide are the two decisions. The model IBC is at ICC. The IEBC chapter number for a change of occupancy is not repeated here. Use the adopted existing-building code.

The kitchen is a second set of comments, and this post does not restate hood types. Grease-producing appliances are the Type I hood guide. Suppression is the UL 300 guide. The grease interceptor is both a plumbing-code item, in the interceptor guide, and often a sewer-utility item the calculator does not settle. Health department review is not the building permit. Ask for that checklist the same week.

Egress moves because the occupant load moves. A retail factor and a dining factor are different rows of Table 1004.5. Run the occupant load calculator on the dining room, the queue, and the kitchen separately. Then check exits in the arrangement guide. A shell that had one exit door for a store may not have two remote exits for a dining room.

Confirm the city's edition on the jurisdictions page before you cite 2021 section numbers. Then upload the shell background and the tenant plan and run a free scan. The change of use is the project. Do not draw it as a paint color.

This is advisory. It is not a determination by the authority having jurisdiction, and it is not health approval. Confirm the adopted edition and local amendments before you change a drawing.