Building Code Guides

Free building-code guides for architects, engineers, and designers.

Run a free scan →
Egress & Occupancy

How Occupant Load Is Calculated Under the IBC

Occupant load under IBC 1004 is floor area divided by the occupant load factor for each use. Here's how to calculate it, with examples.

Read guide →
Egress & Occupancy

Means of Egress Under the IBC: Requirements & Common Mistakes

A means of egress is the continuous path to a public way — exit access, exit, and exit discharge. How occupant load sets exit count, width, and separation under IBC Chapter 10.

Read guide →
Plan Review

Why Building Plans Get Rejected: Common Plan-Review Comments

The most common reasons plans get returned in review — egress and occupant-load errors, accessibility clearances, missing information, energy-code gaps, and code-edition mismatches — and how to catch them before submittal.

Read guide →
Egress & Occupancy

Minimum Corridor and Door Width Under the IBC: Dimensions vs. Capacity

IBC minimum corridor width (44 in, 36 in under 50 occupants, 96 in for I-2 bed movement) and door clear width (32 in), and why the §1005 capacity calculation can override the dimensional minimum.

Read guide →
Egress & Occupancy

Occupant Load Factors by Occupancy Type (IBC Table 1004.5)

The IBC Table 1004.5 occupant load factors by function — business 150 gross, retail 30/60 gross, assembly 7/15 net, classroom 20 net — and the gross-vs-net and function-vs-classification rules that trip designers up.

Read guide →
Equipment & MEP

What Goes on an Equipment Schedule (EQ Sheet) for Plan Review

What an equipment schedule (EQ sheet) is, the columns plan reviewers expect — tag, description, manufacturer/model, qty, plumbing, electrical (volts/phase/amps/watts/connected load) — and why 'basis of design, or approved equal' matters.

Read guide →
Equipment & MEP

Commercial Kitchen Hoods: Type I vs. Type II Requirements (IMC)

Type I hoods capture grease and smoke from cooking equipment; Type II handle heat, steam, and moisture. Which equipment needs which, and the core IMC Chapter 5 exhaust requirements.

Read guide →
Equipment & MEP

Floor Sinks, Indirect Waste & Foodservice Plumbing Basics (IPC)

Why foodservice equipment drains through indirect waste with an air gap to floor sinks, what needs indirect waste, and the core IPC requirements that protect the potable system.

Read guide →
Equipment & MEP

Grease Interceptors: Requirements & Sizing Basics (IPC)

Why foodservice fixtures that discharge grease need a grease interceptor, what connects to it, and the IPC framework for sizing — so fats, oils, and grease don't reach the sewer.

Read guide →
Equipment & MEP

Connected Load & Electrical Rough-In for Commercial Kitchen Equipment

What connected load (VA) means on an equipment schedule, why voltage and phase must be verified per model, and how the electrical engineer uses the schedule to size circuits and service.

Read guide →
Plumbing Fixtures

How to Calculate Required Plumbing Fixtures (IBC 2902 / IPC 403)

Required plumbing fixtures come from occupant load × occupancy ratios in IBC Table 2902.1 / IPC Table 403.1. The step-by-step method: occupant load, split by sex, apply the ratio for your occupancy, round up.

Read guide →
Plumbing Fixtures

Restroom Requirements for Commercial Occupancies (IBC 2902)

How many restrooms a commercial space needs, when separate facilities by sex are required, travel distance to toilet rooms, and customer vs. employee access — under IBC Chapter 29.

Read guide →
Plumbing Fixtures

When a Single-User or All-Gender Restroom Is Required or Allowed (IBC)

When the code allows a single-user toilet room to satisfy requirements, how single-user/all-gender rooms count for both sexes, and the signage and accessibility rules that apply.

Read guide →
Plumbing Fixtures

Service Sink & Mop Sink Requirements (IPC)

Why most commercial occupancies must provide at least one service sink (mop sink), what counts as one, and where it goes — a small required fixture that's easy to forget on a plan.

Read guide →
Plumbing Fixtures

Drinking Fountain & Bottle Filler Requirements (IPC / ADA)

When commercial spaces must provide drinking fountains, how many, the accessible bi-level (hi-lo) requirement, and when bottle fillers count — under the plumbing fixture tables and A117.1.

Read guide →
Plan Review

Tenant Improvement (TI) Plan Review Checklist

What a commercial tenant improvement submittal needs to clear plan review: scope and code analysis, egress and occupant load, accessibility, MEP, and the completeness items that cause most TI rejections.

Read guide →
Plan Review

Change of Occupancy: What Triggers Code Upgrades

When converting a space to a new use changes its occupancy classification, what that triggers — egress, accessibility, fire protection, structural, and energy — under the IBC and Existing Building Code.

Read guide →
Plan Review

What Plan Reviewers Check on a Commercial Submittal

What a building-department plan reviewer actually looks for on a commercial set — life safety, accessibility, completeness, and code-edition correctness — and how to self-check before you submit.

Read guide →
Plan Review

Required Sheets & Title-Block Info for Permit Submittal

What sheets and information a commercial permit set needs — code/life-safety sheet, architectural, MEP, structural, accessibility details — plus the title-block and stamp requirements that cause completeness rejections.

Read guide →
Plan Review

Accessibility Basics for Commercial Tenant Improvements (ADA / A117.1)

The accessibility essentials a commercial TI must address — accessible route and path of travel, restroom clearances and grab bars, reach ranges, and door maneuvering — under IBC Chapter 11, A117.1, and the ADA.

Read guide →
Building & Occupancy

Use & Occupancy Classification Under the IBC

How the IBC sorts every space into an occupancy group (A, B, E, F, H, I, M, R, S, U) — the classification that drives nearly every other code requirement.

Read guide →
Building & Occupancy

Construction Types I–V Explained (IBC Chapter 6)

The five IBC construction types, what separates them, and the fire-resistance ratings each requires for structural frame, walls, and floors.

Read guide →
Building & Occupancy

Allowable Building Height & Area (IBC Chapter 5)

How construction type, occupancy, and sprinklers set allowable area, height, and stories — plus frontage and sprinkler increases.

Read guide →
Building & Occupancy

Mixed-Use & Occupancy Separation (IBC 508)

Separated vs. nonseparated occupancies, required separation ratings from Table 508.4, and when accessory occupancies don't need separation.

Read guide →
Fire & Life Safety

Fire-Resistance-Rated Construction (IBC Chapter 7)

Fire walls, barriers, partitions, and horizontal assemblies — plus opening protectives (716) and through-penetration firestops (714).

Read guide →
Fire & Life Safety

When Are Automatic Sprinklers Required? (IBC 903)

The occupancy, fire-area, occupant-load, and story thresholds that trigger a sprinkler system under IBC 903 — and NFPA 13 vs. 13R.

Read guide →
Fire & Life Safety

Fire Alarm & Detection Requirements (IBC 907)

When a fire alarm or detection system is required by occupancy and occupant load, and the notification basics under IBC 907 and NFPA 72.

Read guide →
Fire & Life Safety

Fire Service Features: Access, Water & FDC (IFC Chapter 5)

Fire apparatus access roads, water supply and hydrants, fire department connections, and key boxes under IFC Chapter 5.

Read guide →
Structural

Structural Design Loads & Combinations (IBC Chapter 16)

Dead, live, snow, and rain loads, ASCE 7 load combinations, and identifying the lateral force-resisting system on a set.

Read guide →
Structural

Seismic Design Basics: SDC & Site Class (IBC 1613)

Seismic design category, site class, and the detailing that follows — what a plan reviewer looks for under IBC 1613 / ASCE 7.

Read guide →
Structural

Wind Design Basics (IBC 1609 / ASCE 7)

Design wind speed, exposure category, and components-and-cladding — and the wind certifications that often live only on a notes sheet.

Read guide →
Structural

Flood Design & Elevation Requirements (IBC 1612)

Flood hazard zones, base flood elevation, required elevation, and flood-resistant construction under IBC 1612 and ASCE 24.

Read guide →
Structural

Soils & Foundations Basics (IBC Chapter 18)

Geotechnical basis, allowable bearing, footings, and when deep foundations are needed — matching foundation type to site conditions.

Read guide →
Mechanical

Ventilation Air Requirements (IMC Chapter 4)

Required outdoor-air rates by occupancy, demand-controlled ventilation, and when natural ventilation is permitted under IMC Chapter 4.

Read guide →
Mechanical

Commercial Exhaust Systems & Ducts (IMC Chapter 5)

Type I/II kitchen hoods, grease ducts, and restroom/specialty exhaust — the IMC Chapter 5 requirements a reviewer checks.

Read guide →
Energy

Building Thermal Envelope (IECC C402)

U-factors, R-values, SHGC, and air-leakage requirements by climate zone under IECC C402 (commercial) and IRC N1102 (residential).

Read guide →
Energy

Energy Compliance Documentation & COMcheck (IECC C103/C408)

The compliance path (prescriptive vs. COMcheck), commissioning, and the plan documentation reviewers require under the IECC.

Read guide →
Accessibility

Accessible Parking & Passenger Loading (IBC 1106)

Required accessible and van stall counts, stall and access-aisle dimensions, and signage under IBC 1106 and ICC A117.1.

Read guide →
Accessibility

Accessible Routes & Elements (IBC 1104)

Route width, turning space, door maneuvering clearances, reach ranges, and protruding objects under IBC 1104 and A117.1.

Read guide →
Accessibility

Accessible Plumbing Facilities (IBC 1109)

Toilet and bathing-room clearances, grab bars, accessible fixture counts, and fountains under IBC 1109 and A117.1.

Read guide →
Egress & Occupancy

Stairway Requirements (IBC 1011)

IBC 1011 stairway geometry: 4–7 inch risers, 11 inch treads, 3/8 inch uniformity, 44 inch width, 80 inch headroom, and required landings.

Read guide →
Egress & Occupancy

Handrails & Guards (IBC 1014–1015)

Handrails (IBC 1014) at 34–38 inches with extensions, and guards (IBC 1015) at 42 inches with the 4-inch sphere rule — what each does and where.

Read guide →
Egress & Occupancy

Travel Distance & Common Path of Egress (IBC 1016–1017)

Exit access travel distance (IBC 1017) and common path of egress travel (1006.2.1) — the limits, how they're measured, and why they drive exit layout.

Read guide →
Egress & Occupancy

Number & Arrangement of Exits (IBC 1006–1007)

How many exits a space needs under IBC 1006–1007, the single-exit conditions, and the remoteness rule requiring exits separated by half the diagonal.

Read guide →
Egress & Occupancy

Exit Sign Requirements (IBC 1013)

Where illuminated exit signs are required under IBC 1013, the 100-foot visibility limit, directional signage, and the 90-minute emergency power rule.

Read guide →
Egress & Occupancy

Means of Egress Illumination (IBC 1008)

IBC 1008 requires 1 foot-candle along the egress path, backed by emergency power for 90 minutes on loss of normal power.

Read guide →
Egress & Occupancy

Egress Ramp Requirements (IBC 1012)

Egress ramp geometry under IBC 1012: 1:12 maximum slope, 30-inch maximum rise per run, 1:48 cross slope, landings, and handrails.

Read guide →
Egress & Occupancy

Accessible Means of Egress & Areas of Refuge (IBC 1009)

IBC 1009 accessible means of egress, areas of refuge and two-way communication — and the sprinkler exception that removes the refuge requirement.

Read guide →
Egress & Occupancy

Exit Discharge (IBC 1028)

Exit discharge under IBC 1028: discharging to a public way, the 50-percent-through-lobby allowance, and egress courts.

Read guide →
Building & Occupancy

Interior Finish & Flame Spread (IBC Chapter 8)

IBC Chapter 8 interior finish classes A, B, and C by flame-spread index — and why the required class gets stricter closer to the egress path.

Read guide →
Building & Occupancy

Safety Glazing in Hazardous Locations (IBC 2406)

IBC 2406 safety glazing: the hazardous locations that require tempered or laminated glass, and the permanent labeling reviewers look for.

Read guide →
Building & Occupancy

Roof Assemblies & Rooftop Structures (IBC Chapter 15)

IBC Chapter 15 roof covering fire classes A/B/C by construction type, plus penthouses and rooftop structures — and when a penthouse counts as a story.

Read guide →
Building & Occupancy

Exterior Wall Fire Protection (IBC 705)

IBC 705 ties exterior wall ratings and allowable openings to fire separation distance — the site-plan-to-elevation coordination reviewers check.

Read guide →
Building & Occupancy

Special Occupancy Requirements (IBC Chapter 4)

IBC Chapter 4 special occupancies: high-rise (403), atriums (404), and covered malls (402) — the thresholds that pull in added requirements.

Read guide →
Building & Occupancy

Existing Buildings & Alterations (IEBC)

The IEBC scales requirements to scope: Level 1, 2, and 3 alterations, change of occupancy, additions, and historic-building pathways.

Read guide →
Fire & Life Safety

Standpipe Systems (IBC 905)

IBC 905 standpipes: Class I, II, and III, the height and occupancy triggers, and how they tie into the sprinkler riser and stair design.

Read guide →
Fire & Life Safety

Commercial Kitchen Hood Suppression (IBC 904 / UL 300)

IBC 904 and UL 300 wet-chemical suppression for Type I hoods — nozzle coverage matched to appliances and interlocked fuel/power shutoff.

Read guide →
Fire & Life Safety

Hazardous Materials & Control Areas (IBC 414–415)

IBC 414–415 maximum allowable quantities and control areas — and the threshold where hazardous materials trigger a Group H occupancy.

Read guide →
Structural

Special Inspections & the Statement of Special Inspections (IBC Chapter 17)

IBC Chapter 17 special inspections and the Statement of Special Inspections — what it must cover and why it belongs in the permit set.

Read guide →
Structural

Wood Framing & Wall Bracing (IBC Chapter 23)

IBC Chapter 23 wood framing, lateral wall bracing and shear walls, and the fastening schedule reviewers expect as a clear table.

Read guide →
Mechanical

Fire & Smoke Dampers in Duct Systems (IMC Chapter 6)

IMC Chapter 6 fire, smoke, and combination dampers where ducts penetrate rated assemblies — the classic mechanical/architectural coordination gap.

Read guide →
Energy

Lighting Power & Controls (IECC C405)

IECC C405 lighting power density plus required controls — occupancy sensors, automatic shutoff, and daylight-responsive controls.

Read guide →
Energy

Mechanical System Efficiency (IECC C403)

IECC C403 minimum equipment efficiencies, economizers, demand-controlled ventilation, and the controls that surface in COMcheck mechanical.

Read guide →
Equipment & MEP

Emergency & Standby Power (IBC 2702 / NEC 700–702)

IBC 2702 and NEC 700–702: emergency, legally required standby, and optional standby — and which life-safety loads need a true emergency source.

Read guide →
Accessibility

Accessible Entrances (IBC 1105)

IBC 1105 accessible entrances: the 60-percent rule plus the specific entrances — parking, transit, tenant — that must be accessible.

Read guide →
Try our building code calculators →

Stop reading, start checking.

Upload a plan set and InstaPreView flags likely code issues — occupant load, egress, and more — before you submit to the AHJ.

Run a free scan →