A building permit approval does not close the fire review.

InstaPreView · Published November 12, 2026 · Updated November 12, 2026
Line drawing of a construction drawing sheet with a title block and a revision cloud, titled “Building review and fire review are not the same submittal”. InstaPreView by Byts & Bytes.

Passing the building department does not mean the fire marshal is done. On many commercial projects those are two reviews, two comment letters, and two people who can hold the permit. Treating them as one "city comment" is how a sprinkler note gets approved on the architectural set and rejected on the fire set.

The 2021 IBC says the overlap out loud. The preface to Chapter 9 says that chapter prescribes the active fire protection systems, and that it is substantially duplicated in Chapter 9 of the International Fire Code. The fire code adds testing and maintenance the building code does not. You can read the model building code at ICC and the model fire code at the 2021 IFC. The adopted pair, and which office enforces which one, is a local fact. Check it on the jurisdictions page and then with the two offices. A city page that says the edition is still being verified is not the answer.

Split the set the way the reviewers are split. The building reviewer is looking at occupancy, construction type, egress, and the architectural life-safety plan. Start with what reviewers check. The fire reviewer is looking at the systems in Chapter 9 and the IFC: sprinklers (when they are required), alarms, standpipes, extinguishers (IFC 906), and fire service access (IFC Chapter 5). A deferred sprinkler design still has to be listed on the construction documents. That rule is in the building code's administrative chapter, and it is covered in the deferred-submittal note in this same set of posts. Do not leave the fire reviewer a blank sheet and a promise.

The mistake is one code sheet that says "fire sprinklers by others" and a fire submittal that nobody sent. The building comment and the fire comment will both say the system is missing, and they will not cancel each other out.

Before you submit either package, upload the architectural set and run a free scan. It will not replace the fire marshal. It will show you the building-code comments you can clear first.

This is advisory. It is not a determination by the authority having jurisdiction. Confirm the adopted edition and local amendments before you change a drawing.