You spent a sprinkler credit the drawings do not buy
Fully sprinklered is not a note. It is a standard, and the section has to name it.
The code sheet says the building is fully sprinklered, so the corridors are 0 hours and the dead ends are 50 feet. The sprinkler drawings are a 13R system, or they are not in the set at all. The credit is rejected because the section you wanted names a different system.
The 2021 IBC does not have one sprinkler switch. It names the standard.
- Section 903.3.1.1 is an NFPA 13 system. Section 903.3.1.2 is NFPA 13R. Section 903.3.1.3 is NFPA 13D. When sprinklers are required is the threshold question. The credit question is which of those three you designed.
- Exit separation in Section 1007.1.1 is one-half the diagonal. Exception 2 reduces it to one-third where the building is sprinklered throughout under 903.3.1.1 or 903.3.1.2. That exception allows 13 or 13R, where 13R is allowed. The exit arrangement guide is the rest of that rule.
- Dead-end corridors in Section 1020.5 stay at 20 feet unless an exception applies. The 50-foot exception for the listed occupancies requires 903.3.1.1. A 13R building does not get that exception as written. See the dead-end guide.
- Corridor rating is Table 1020.2. For Groups A, B, E, F, M, S, and U, a corridor serving more than 30 occupants is 1 hour without sprinklers and 0 hours with the sprinkler system the table requires. Group R does not drop to zero. See the rated corridor guide.
The chapter is 2021 IBC Chapter 10. Local amendments delete these trades often. Read the ordinance. The jurisdictions page is where you confirm which model edition the ordinance amended.
On the code sheet, write the standard and the section whose number you are using. If the sprinkler design is deferred, list it under Section 107.3.4.1 and do not spend a credit the deferred design might not provide.
The mistake is one note, "fully sprinklered," funding three different sections that do not accept the same system.