Line drawing of a construction drawing sheet with a title block and a revision cloud, titled “The code sheet and the plans describe two different buildings”. InstaPreView by Byts & Bytes.

Reviewers believe the floor plan when it disagrees with the code sheet, and then they reject both until they match. The comment is not that your occupant load math is exotic. The comment is that the code sheet says 48 occupants, the furniture plan shows a training room full of chairs, and the door schedule was written for the 48.

Occupant load is IBC Section 1004 and Table 1004.5. The factor follows the function of the space, not the occupancy letter on the cover. The occupant load guide and the factor guide are the method. The calculator will total a multi-room schedule if you give it one row per function. A business area at 150 gross square feet per occupant is the factor that guide already prints. A conference room full of chairs is not that row. Run the rooms separately, put the total on the code sheet, and use that same total on the life-safety plan and in the egress width calculator.

Do the same audit for the other numbers that travel:

  • Sprinklered or not, and to which standard. A 0-hour corridor under the 2021 Table 1020.2 is only available when that table's sprinkler condition is true. The model table is in the 2021 IBC Chapter 10.
  • Construction type and allowable area. If the code sheet claims a sprinkler increase, the height and area guide is the table, and the sprinkler drawings have to exist or be deferred in writing.
  • The adopted edition. If the sheet says 2021 and the city is not on 2021, fix that before you defend a width. See how to find the edition.

The mistake is updating the code sheet after the plans were plotted, and not opening the plans again. Pick three figures — occupant load, corridor rating, sprinkler standard — and find each one on a drawing. If you cannot, the reviewer will, and the letter will be one sentence long.

Upload the set and run a free scan after the three figures match. A pre-review of a set that disagrees with itself only multiplies the comments.

This is advisory. It is not a determination by the authority having jurisdiction. Confirm the adopted edition and local amendments before you change a drawing.