Jurisdiction note · DC
Building code review notes for Washington, DC
Adopted code editions
The InstaPreView code corpus returned edition_trust "provisional" and source_quality "unverified" (corpus updated 2026-11-13). Those are API labels. This page does not treat them as human verification. Mechanical and energy editions are not separate fields in the corpus response, so those corpus cells stay empty unless a future API field exists. The plumbing corpus field is named ipc_edition even when the recorded text is a Uniform Plumbing Code.
| Family | Public sources | Code corpus |
|---|---|---|
| Building |
|
Code corpus 2017 DC Building Code (2015 IBC) |
| Residential |
|
Code corpus 2017 DC Residential Code (2015 IRC) |
| Fire |
|
Code corpus 2017 DC Fire Code (2015 IFC) |
| Mechanical |
|
No corpus value for this family. |
| Plumbing |
|
Code corpus 2017 DC Plumbing Code (2015 IPC) |
| Energy |
|
No corpus value for this family. |
| Electrical |
|
Code corpus 2014 NEC |
| Existing building |
|
Code corpus 2017 DC Existing Building Code (2015 IEBC) |
Local amendments quoted from public sources
No local amendment text was filed for Washington, DC.
Building department
-
Name. The Department of Buildings publishes the DC Construction Codes and reviews plans in ProjectDox.
Source: https://dob.dc.gov/page/dc-construction-codes Accessed 2026-11-12. Human verification: not claimed.
-
Official page. The construction-codes page is https://dob.dc.gov/page/dc-construction-codes.
Source: https://dob.dc.gov/page/dc-construction-codes Accessed 2026-11-12. Human verification: not claimed.
Plan submittal
-
Method. The ProjectDox page says customers complete an online checklist, file the permit through AccessDC, and then upload plans in ProjectDox.
Source: https://dob.dc.gov/projectdox Accessed 2026-11-12. Human verification: not claimed.
-
Portal. The plan-upload platform is ProjectDox. The application step is AccessDC.
Source: https://dob.dc.gov/projectdox Accessed 2026-11-12. Human verification: not claimed.
Design criteria quoted from the building department
No design-criteria table was filed for Washington, DC.
Items an official checklist asks for
No official submittal checklist was filed for Washington, DC.
Published plan-review rejection themes
No official ranking of plan-review rejections was found in the sources reviewed for Washington, DC. A generic rejection list is not shown in its place.
Common themes for this kind of review
InstaPreView's guide to common plan-review comments describes recurring categories on commercial sets: egress and occupant-load errors, accessibility clearances, incomplete documents, energy-code documentation, and a code edition that does not match the one the jurisdiction adopted. That guide is a national pattern. It is not a Washington, DC statistic. Read the guide.
Limits of these sources
-
The construction-codes page says the 2017 DC Construction Codes consist of the 2015 ICC family, the 2014 National Electrical Code, and 2013 ASHRAE 90.1, as amended by DCMR Title 12, and took effect May 29, 2020.
Source: https://dob.dc.gov/page/dc-construction-codes Accessed 2026-11-12. Human verification: not claimed.
-
The ProjectDox applicant guide says DOB currently conducts its review under the 2017 DCMR Construction Codes.
Source: https://dob.dc.gov/sites/default/files/dc/sites/dob/ProjectDox%20Applicant%20User%20Guide%202.14.25.pdf Accessed 2026-11-12. Human verification: not claimed.
Questions
Which building code do the filed sources name for Washington, DC?
The 2017 codes page lists the DC Building Code amendments with the 2015 International Building Code. The InstaPreView code corpus lists "2017 DC Building Code (2015 IBC)" (corpus trust label: provisional). That label is not human verification.
Who reviews building plans in Washington, DC?
The Department of Buildings publishes the DC Construction Codes and reviews plans in ProjectDox. The construction-codes page is https://dob.dc.gov/page/dc-construction-codes.
How are building plans submitted in Washington, DC?
The ProjectDox page says customers complete an online checklist, file the permit through AccessDC, and then upload plans in ProjectDox. The plan-upload platform is ProjectDox. The application step is AccessDC.
Does this page approve a building permit in Washington, DC?
No. This page is an advisory research note from InstaPreView, a Byts & Bytes product. It is not a permit, not a code interpretation from the authority having jurisdiction, and not a substitute for a licensed design professional. Confirm the edition and the submittal rules with the building department before you rely on them. https://www.instapreview.co/disclaimer
Sources
Occupant-load calculator
The embedded calculator uses model IBC Table 1004.5 factors. It does not apply a local amendment unless you check that amendment yourself.
Scan a plan set before you submit
Run an advisory pre-review of a Washington, DC plan set. The scan does not issue a permit.
Scan a plan set