Jurisdiction note · HI
Building code review notes for Honolulu, HI
Adopted code editions
The InstaPreView code corpus returned edition_trust "provisional" and source_quality "unverified" (corpus updated 2026-11-20). Those are API labels. This page does not treat them as human verification. Mechanical and energy editions are not separate fields in the corpus response, so those corpus cells stay empty unless a future API field exists. The plumbing corpus field is named ipc_edition even when the recorded text is a Uniform Plumbing Code.
| Family | Public sources | Code corpus |
|---|---|---|
| Building |
|
Code corpus 2018 IBC with State and City amendments |
| Residential |
|
Code corpus 2018 IRC with State and City amendments |
| Fire |
|
Code corpus 2021 NFPA 1 |
| Mechanical | Not found in the sources reviewed for this profile. |
No corpus value for this family. |
| Plumbing |
|
Code corpus 2021 UPC (interim) |
| Energy |
|
No corpus value for this family. |
| Electrical |
|
Code corpus 2020 NEC (interim) |
| Existing building |
|
Code corpus 2018 IEBC with State and City amendments |
Local amendments quoted from public sources
-
The DPP Codes Currently in Effect table records State and City amendments for the 2018 IBC, IRC, IEBC, and IECC, City Addendum #1 for the building and residential codes effective March 11, 2025, and refers fire-code questions to HFD. The DPP Ordinances (ROH) page points to ROH Chapter 16 for the building, residential, and existing-building adoptions, including Ordinance 24-15 and 24-17.
Source: https://www.honolulu.gov/dpp/resources/ordinances/ Accessed 2026-11-20. Human verification: not claimed.
Building department
-
Name. The City and County of Honolulu Department of Planning and Permitting (DPP) administers building permits. The Building Permits page lists Director Dawn Takeuchi Apuna, Deputy Director Steven C. K. W. Young, P.E., and a contact block at 650 South King Street, 7th Floor, Honolulu, Hawaii 96813, (808) 768-8000.
Source: https://www.honolulu.gov/dpp/permitting/building-permits-home/ Accessed 2026-11-20. Human verification: not claimed.
-
Official page. The official page used for this profile is https://www.honolulu.gov/dpp/permitting/building-permits-home/.
Source: https://www.honolulu.gov/dpp/permitting/building-permits-home/ Accessed 2026-11-20. Human verification: not claimed.
-
Address. The DPP Building Permits page contact block lists 650 South King Street, 7th Floor, Honolulu, Hawaii 96813.
Source: https://www.honolulu.gov/dpp/permitting/building-permits-home/ Accessed 2026-11-20. Human verification: not claimed.
-
Phone. The DPP Building Permits page contact block lists (808) 768-8000 (and (808) 768-6743).
Source: https://www.honolulu.gov/dpp/permitting/building-permits-home/ Accessed 2026-11-20. Human verification: not claimed.
Plan submittal
-
Method. The DPP Building Permits page lists Instant Online Permit and Building Permit (with Plans) among its permit types. The same department site also provides an HNL Build user portal and CivCheck.
Source: https://www.honolulu.gov/dpp/permitting/building-permits-home/ Accessed 2026-11-20. Human verification: not claimed.
-
Portal. The portal is named HNL Build.
Source: https://www.honolulu.gov/dpp/permitting/building-permits-home/ Accessed 2026-11-20. Human verification: not claimed.
Design criteria quoted from the building department
No design-criteria table was filed for Honolulu, HI.
Items an official checklist asks for
No official submittal checklist was filed for Honolulu, HI.
Published plan-review rejection themes
No official ranking of plan-review rejections was found in the sources reviewed for Honolulu, HI. A generic rejection list is not shown in its place.
Common themes for this kind of review
InstaPreView's guide to common plan-review comments describes recurring categories on commercial sets: egress and occupant-load errors, accessibility clearances, incomplete documents, energy-code documentation, and a code edition that does not match the one the jurisdiction adopted. That guide is a national pattern. It is not a Honolulu, HI statistic. Read the guide.
Limits of these sources
-
Mechanical and fuel-gas editions are not listed in the Codes Currently in Effect table and are left blank. Electrical and plumbing are listed as interim editions. Dates are taken from that official table as written (08/09/24, 03/11/25, 12/15/22, 03/15/24, 03/01/24, and 01/03/25).
Source: https://www.honolulu.gov/dpp/permitting/building-permits-home/ Accessed 2026-11-20. Human verification: not claimed.
Questions
Which building code do the filed sources name for Honolulu, HI?
The City and County of Honolulu Department of Planning and Permitting Building Permits page, in its Codes Currently in Effect table, lists the Building Code (ROH Chapter 16) as the 2018 IBC with State and City amendments, effective August 9, 2024, and City Addendum #1 effective March 11, 2025. The InstaPreView code corpus lists "2018 IBC with State and City amendments" (corpus trust label: provisional). That label is not human verification.
Who reviews building plans in Honolulu, HI?
The City and County of Honolulu Department of Planning and Permitting (DPP) administers building permits. The Building Permits page lists Director Dawn Takeuchi Apuna, Deputy Director Steven C. K. W. Young, P.E., and a contact block at 650 South King Street, 7th Floor, Honolulu, Hawaii 96813, (808) 768-8000. The official page used for this profile is https://www.honolulu.gov/dpp/permitting/building-permits-home/. The DPP Building Permits page contact block lists 650 South King Street, 7th Floor, Honolulu, Hawaii 96813. The DPP Building Permits page contact block lists (808) 768-8000 (and (808) 768-6743).
How are building plans submitted in Honolulu, HI?
The DPP Building Permits page lists Instant Online Permit and Building Permit (with Plans) among its permit types. The same department site also provides an HNL Build user portal and CivCheck. The portal is named HNL Build.
What local amendments do the filed sources quote for Honolulu, HI?
The DPP Codes Currently in Effect table records State and City amendments for the 2018 IBC, IRC, IEBC, and IECC, City Addendum #1 for the building and residential codes effective March 11, 2025, and refers fire-code questions to HFD. The DPP Ordinances (ROH) page points to ROH Chapter 16 for the building, residential, and existing-building adoptions, including Ordinance 24-15 and 24-17.
Does this page approve a building permit in Honolulu, HI?
No. This page is an advisory research note from InstaPreView, a Byts & Bytes product. It is not a permit, not a code interpretation from the authority having jurisdiction, and not a substitute for a licensed design professional. Confirm the edition and the submittal rules with the building department before you rely on them. https://www.instapreview.co/disclaimer
Sources
Occupant-load calculator
The embedded calculator uses model IBC Table 1004.5 factors. It does not apply a local amendment unless you check that amendment yourself.
Scan a plan set before you submit
Run an advisory pre-review of a Honolulu, HI plan set. The scan does not issue a permit.
Scan a plan set