Jurisdiction note · UT
Building code review notes for Salt Lake City, UT
Adopted code editions
The InstaPreView code corpus returned edition_trust "provisional" and source_quality "unverified" (corpus updated 2026-11-13). Those are API labels. This page does not treat them as human verification. Mechanical and energy editions are not separate fields in the corpus response, so those corpus cells stay empty unless a future API field exists. The plumbing corpus field is named ipc_edition even when the recorded text is a Uniform Plumbing Code.
| Family | Public sources | Code corpus |
|---|---|---|
| Building |
|
Code corpus 2024 IBC (Utah 15A-2-103) |
| Residential |
|
Code corpus 2021 IRC (Utah 15A-2-103) |
| Fire | Not found in the sources reviewed for this profile. |
No corpus value for this family. |
| Mechanical |
|
No corpus value for this family. |
| Plumbing |
|
Code corpus 2024 IPC |
| Energy |
|
No corpus value for this family. |
| Electrical |
|
Code corpus NEC 2023 |
| Existing building |
|
Code corpus 2024 IEBC |
Local amendments quoted from public sources
No local amendment text was filed for Salt Lake City, UT.
Building department
-
Name. Salt Lake City Building Services administers permits and says the city follows the building and fire codes adopted and amended by the State of Utah, with limited additional provisions in Title 18.
Source: https://www.slc.gov/buildingservices/current-building-codes/ Accessed 2026-11-12. Human verification: not claimed.
-
Official page. The current building codes page is https://www.slc.gov/buildingservices/current-building-codes/.
Source: https://www.slc.gov/buildingservices/current-building-codes/ Accessed 2026-11-12. Human verification: not claimed.
Plan submittal
-
Method. The city page says that when a code change is anticipated, the codes in effect on the date the plan submission is accepted for building permit review are applied, provided fees are paid and application time limits are not exceeded.
Source: https://www.slc.gov/buildingservices/current-building-codes/ Accessed 2026-11-12. Human verification: not claimed.
Design criteria quoted from the building department
No design-criteria table was filed for Salt Lake City, UT.
Items an official checklist asks for
No official submittal checklist was filed for Salt Lake City, UT.
Published plan-review rejection themes
No official ranking of plan-review rejections was found in the sources reviewed for Salt Lake City, UT. A generic rejection list is not shown in its place.
Common themes for this kind of review
InstaPreView's guide to common plan-review comments describes recurring categories on commercial sets: egress and occupant-load errors, accessibility clearances, incomplete documents, energy-code documentation, and a code edition that does not match the one the jurisdiction adopted. That guide is a national pattern. It is not a Salt Lake City, UT statistic. Read the guide.
Limits of these sources
-
The 2021 IRC next to the 2024 IBC is the pairing in the current statute, not a conflict between sources. A later version of 15A-2-103 is marked superseded January 1, 2027; this profile uses the text effective July 1, 2026. The fire-code edition is left empty pending Title 15A Chapter 5.
Source: https://le.utah.gov/xcode/Title15A/Chapter2/C15A-2-S103_2026050620260701.html Accessed 2026-11-12. Human verification: not claimed.
-
The city page points to Utah Code Title 15A Chapter 5 for fire codes. This profile does not record a fire-code edition from Chapter 2, which is the construction-code section.
Source: https://www.slc.gov/buildingservices/current-building-codes/ Accessed 2026-11-12. Human verification: not claimed.
Questions
Which building code do the filed sources name for Salt Lake City, UT?
Utah Code section 15A-2-103, effective July 1, 2026 and superseded January 1, 2027, incorporates the 2024 edition of the International Building Code, including Appendices C and J. The Salt Lake City current-codes page says the city follows the codes adopted in Title 15A. The InstaPreView code corpus lists "2024 IBC (Utah 15A-2-103)" (corpus trust label: provisional). That label is not human verification.
Who reviews building plans in Salt Lake City, UT?
Salt Lake City Building Services administers permits and says the city follows the building and fire codes adopted and amended by the State of Utah, with limited additional provisions in Title 18. The current building codes page is https://www.slc.gov/buildingservices/current-building-codes/.
How are building plans submitted in Salt Lake City, UT?
The city page says that when a code change is anticipated, the codes in effect on the date the plan submission is accepted for building permit review are applied, provided fees are paid and application time limits are not exceeded.
Does this page approve a building permit in Salt Lake City, UT?
No. This page is an advisory research note from InstaPreView, a Byts & Bytes product. It is not a permit, not a code interpretation from the authority having jurisdiction, and not a substitute for a licensed design professional. Confirm the edition and the submittal rules with the building department before you rely on them. https://www.instapreview.co/disclaimer
Sources
Occupant-load calculator
The embedded calculator uses model IBC Table 1004.5 factors. It does not apply a local amendment unless you check that amendment yourself.
Scan a plan set before you submit
Run an advisory pre-review of a Salt Lake City, UT plan set. The scan does not issue a permit.
Scan a plan set