Combining two tenant suites

The demising wall was doing egress work. Taking it out is not only a finish change.

InstaPreView · Published November 12, 2026 · Updated November 12, 2026
Line drawing of a tenant floor plan with demising walls and one suite outlined, titled “Combining two tenant suites”. InstaPreView by Byts & Bytes.

Two Group B suites become one. The landlord calls it a demise removal. Plan review calls it a new occupant load, a new exit access path, and sometimes a new dead end. The occupancy letter can stay Group B and the set can still fail.

Start with the people. Table 1004.5 assigns a factor by function, not by the old suite number. Open offices, conference rooms, and storage do not share a factor. The occupant load guide and the calculator are how you get one total for the combined suite. That total replaces both of the old totals. It drives the number of exits, in the exit arrangement guide, and the width, in the egress width calculator. A suite that was fine at 40 occupants is not fine at 90 if the second exit was the stair you can no longer reach without crossing the other tenant.

Then walk the corridor you just created. Removing a wall can leave a leg with only one way out. In the 2021 IBC, Section 1020.5 limits that dead end to 20 feet, or 50 feet for Group B only when the building is sprinklered throughout under Section 903.3.1.1. The dead-end guide is the exception list. The model text is Chapter 10. If the building corridor is rated, the new opening in it is a rated door, not a pair of unrated storefronts. See Table 1020.2 and Table 716.1(2).

If the combined suite adds a break room with cooking, a large copy room, or a private restroom, check incidental uses before you call everything business. A laundry or a furnace room over the table's threshold is not "part of the office."

The shell's construction type and sprinkler standard usually stay. Say so on the code sheet, and say what changed. The tenant improvement checklist is the longer list. Confirm the edition on the jurisdictions page. A 2018 city still uses the old dead-end section number.

Upload the demolition plan and the new plan together and run a free scan. The comment lives in the difference between those two sheets.

This is advisory. It is not a determination by the authority having jurisdiction. Confirm the adopted edition and local amendments before you change a drawing.