Jurisdiction note · OR
Building code review notes for Beaverton, OR
Adopted code editions
The InstaPreView code corpus returned edition_trust "provisional" and source_quality "unverified" (corpus updated 2026-11-17). Those are API labels. This page does not treat them as human verification. Mechanical and energy editions are not separate fields in the corpus response, so those corpus cells stay empty unless a future API field exists. The plumbing corpus field is named ipc_edition even when the recorded text is a Uniform Plumbing Code.
| Family | Public sources | Code corpus |
|---|---|---|
| Building |
|
Code corpus OSSC 2025 (2024 IBC) |
| Residential |
|
Code corpus ORSC 2023 (2026 ORSC in phase-in to 2027-04-01) |
| Fire |
|
Code corpus OFC 2025 (2024 IFC) |
| Mechanical |
|
No corpus value for this family. |
| Plumbing |
|
Code corpus OPSC 2026 (2024 UPC) |
| Energy |
|
No corpus value for this family. |
| Electrical |
|
Code corpus OESC 2026 (2026 NEC) |
| Existing building |
|
Code corpus 2024 IEBC (via 2025 OSSC) |
Local amendments quoted from public sources
No local amendment text was filed for Beaverton, OR.
Building department
-
Name. The City of Beaverton Community Development Department, Building Division, 12725 SW Millikan Way (4th floor), Beaverton, OR 97076 (503-526-2493), issues building, plumbing, mechanical and electrical permits.
Source: https://content.civicplus.com/api/assets/5f8990fa-7f7f-4d5b-a9c2-e9a332aceb6d Accessed 2026-11-17. Human verification: not claimed.
-
Official page. The official page used for this profile is https://content.civicplus.com/api/assets/5f8990fa-7f7f-4d5b-a9c2-e9a332aceb6d.
Source: https://content.civicplus.com/api/assets/5f8990fa-7f7f-4d5b-a9c2-e9a332aceb6d Accessed 2026-11-17. Human verification: not claimed.
Plan submittal
-
Method. Beaverton's Building Division operating plan says permit applications are made online at prod.buildinginbeaverton.org (the Beaverton Electronic Permitting System) and are checked for completeness within 24 hours; projects needing plan review include a signed Tri-County Application Checklist.
Source: https://content.civicplus.com/api/assets/73fe87af-da77-4369-8cc3-b6163c29988c Accessed 2026-11-17. Human verification: not claimed.
Design criteria quoted from the building department
No design-criteria table was filed for Beaverton, OR.
Items an official checklist asks for
No official submittal checklist was filed for Beaverton, OR.
Published plan-review rejection themes
No official ranking of plan-review rejections was found in the sources reviewed for Beaverton, OR. A generic rejection list is not shown in its place.
Common themes for this kind of review
InstaPreView's guide to common plan-review comments describes recurring categories on commercial sets: egress and occupant-load errors, accessibility clearances, incomplete documents, energy-code documentation, and a code edition that does not match the one the jurisdiction adopted. That guide is a national pattern. It is not a Beaverton, OR statistic. Read the guide.
Limits of these sources
-
Oregon building codes are statewide specialty codes adopted by the Building Codes Division under ORS Chapter 455; cities enforce them and may not adopt different technical editions. The fire code is the statewide 2025 Oregon Fire Code; a local fire code official may enforce local fire amendments that were not reviewed for this profile. Residential work is in the 2026 ORSC phase-in until April 1, 2027. Beaverton's code sheet still lists the 2023 ORSC; the 2026 ORSC is in its phase-in period and becomes mandatory April 1, 2027.
Source: https://www.oregon.gov/bcd/codes-stand/pages/ossc-adoption.aspx Accessed 2026-11-17. Human verification: not claimed.
Questions
Which building code do the filed sources name for Beaverton, OR?
The Oregon Building Codes Division says the 2025 Oregon Structural Specialty Code is based on the 2024 International Building Code, International Fire Code, and International Existing Building Code. Its administrative provisions were effective and mandatory October 1, 2025; its construction provisions were effective October 1, 2025 with a six-month phase-in and mandatory April 1, 2026. Beaverton's Currently Adopted Codes sheet (B70-1096, rev. 10/26) says the city adopts the State of Oregon building codes without local amendments, as required by ORS Chapter 455, and lists the 2025 OSSC, 2025 OEESC, 2023 ORSC, 2026 OESC (2026 NEC), 2025 OMSC and 2026 OPSC (2024 UPC). It also lists Seismic Design Category D and a 12-inch frost depth. The InstaPreView code corpus lists "OSSC 2025 (2024 IBC)" (corpus trust label: provisional). That label is not human verification.
Who reviews building plans in Beaverton, OR?
The City of Beaverton Community Development Department, Building Division, 12725 SW Millikan Way (4th floor), Beaverton, OR 97076 (503-526-2493), issues building, plumbing, mechanical and electrical permits. The official page used for this profile is https://content.civicplus.com/api/assets/5f8990fa-7f7f-4d5b-a9c2-e9a332aceb6d.
How are building plans submitted in Beaverton, OR?
Beaverton's Building Division operating plan says permit applications are made online at prod.buildinginbeaverton.org (the Beaverton Electronic Permitting System) and are checked for completeness within 24 hours; projects needing plan review include a signed Tri-County Application Checklist.
Does this page approve a building permit in Beaverton, OR?
No. This page is an advisory research note from InstaPreView, a Byts & Bytes product. It is not a permit, not a code interpretation from the authority having jurisdiction, and not a substitute for a licensed design professional. Confirm the edition and the submittal rules with the building department before you rely on them. https://www.instapreview.co/disclaimer
Sources
- https://content.civicplus.com/api/assets/5f8990fa-7f7f-4d5b-a9c2-e9a332aceb6d
- https://content.civicplus.com/api/assets/73fe87af-da77-4369-8cc3-b6163c29988c
- https://www.oregon.gov/bcd/codes-stand/pages/ossc-adoption.aspx
- https://www.oregon.gov/bcd/codes-stand/pages/adopted-codes.aspx
- https://www.oregon.gov/osfm/fire-service-partners/pages/oregon-fire-code.aspx
Occupant-load calculator
The embedded calculator uses model IBC Table 1004.5 factors. It does not apply a local amendment unless you check that amendment yourself.
Scan a plan set before you submit
Run an advisory pre-review of a Beaverton, OR plan set. The scan does not issue a permit.
Scan a plan set