Build an EQ-100-style equipment schedule. Add equipment manually, extract from spec PDFs or product URLs, then export to Excel, PDF, or DXF. Auto-extracted fields are flagged for verification — nothing is fabricated.
Mfr / model = Basis of Design “or approved equal.”
| TAG | DESCRIPTION | MANUFACTURER (BOD) | MODEL NO. | QTY | PLUMBING (HW/CW) | VOLTS | PHASE | AMPS | WATTS | CONN. LOAD (VA) | NOTES / VERIFY | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MECHANICAL | |||||||||||||
| ELECTRICAL | |||||||||||||
An equipment schedule (EQ-100) lists every piece of fixed equipment on a project — mechanical, electrical, plumbing, kitchen, and specialty items — with their electrical and plumbing requirements. This builder lets you type entries, extract from spec PDFs or product URLs (auto-extracted fields are flagged VERIFY for human verification), and export the schedule in standard EQ-100 format.
Check your full plan set →This tool helps build an equipment schedule for reference. Auto-extracted values are best-effort and must be verified against actual spec sheets. It is not a substitute for the engineer of record's review.