Required hourly ratings for the primary structural frame, bearing walls, nonbearing walls, floors, and roofs by construction type, with the Table 601 footnotes and the Table 705.5 exterior wall check.
Edition: 2021 IBC model text, Table 601 and footnotes a through g, Sections 602.1 through 602.5, and Table 705.5 for exterior walls. Local amendments and the 2024 IBC are not applied.
| Building element | Required rating | Basis |
|---|---|---|
| Primary structural frame b, c, f | 1 hr | Table 601, Type II-A |
| Bearing walls, exterior e, f | 1 hr | Table 601, Type II-A |
| Bearing walls, interior | 1 hr | Table 601, Type II-A |
| Nonbearing walls and partitions, exterior | See Table 705.5 | Table 601 refers to Table 705.5; enter the occupancy and fire separation distance |
| Nonbearing walls and partitions, interior d | 0 hr | Table 601, Type II-A |
| Floor construction and associated secondary structural members | 1 hr | Table 601, Type II-A |
| Roof construction and associated secondary structural members b, c | 1 hr | Table 601, Type II-A |
Exterior bearing walls must also meet Table 705.5 for their fire separation distance (footnote e). Enter the occupancy and distance to check it.
Footnote c: heavy timber complying with Section 2304.11 is allowed for roof construction, including primary frame members, where 1 hour or less is required.
Footnote f: the primary frame and exterior bearing walls are also not less than the rating referenced in Section 704.10.
Footnote d: interior nonbearing walls are 0 hours under Table 601 but take any rating required elsewhere in the code, such as corridors, shafts, fire barriers, and separations.
Type II-A, a Type V-A office wall 4 feet from the lot line, a Type II-B warehouse wall at 4 feet, and a Type I-A roof more than 20 feet up.
Type II-A reads 1 hr for the primary frame, 1 hr for bearing walls, 1 hr for floors, and 1 hr for the roof. A Type V-A Group B exterior bearing wall 4 feet from the line is 1 hr in Table 601 and 1 hr in Table 705.5, so it is 1 hr. A Type II-B Group S-1 exterior bearing wall at 4 feet is 0 hr in Table 601, but footnote e sends it to Table 705.5, which requires 2 hr. A Type I-A Group B roof whose construction is 20 feet or more above the floor below drops from 1 1/2 hr to 0 hr under footnote b, while the floor stays 2 hr.
The construction type has to support the building's height and area; check it with the allowable height and area calculator. Exterior wall openings are limited separately in Table 705.8; use the exterior wall and openings calculator. The construction type guide explains Types I through V.
Table 601 of the 2021 IBC sets hourly ratings for the primary structural frame, bearing walls, nonbearing walls, floors, and roofs. Type I-A is 3 hours for the frame and bearing walls, 2 hours for floors, and 1 1/2 hours for the roof. Type I-B is 2, 2, 2, and 1. Types II-A, III-A, and V-A are 1-hour construction for the frame, floors, and roof. Types II-B, III-B, and V-B have no frame, floor, or roof rating. Local amendments vary, so check the jurisdiction page for the adopted edition.
Footnote e makes an exterior bearing wall not less than the rating Table 705.5 requires for its fire separation distance. A Type II-B Group S-1 bearing wall 4 feet from the lot line is 0 hours in Table 601 but 2 hours in Table 705.5, so it needs 2 hours. Nonbearing exterior walls are rated by Table 705.5 alone.
Footnote b drops the protection of roof construction, including primary frame members in the roof, roof framing, and decking, where every part of the roof construction is 20 feet or more above any floor immediately below. It does not apply to Groups F-1, H, M, and S-1. Footnote a separately lets the frame and bearing walls drop 1 hour where they support a roof only.
This calculator uses the 2021 International Building Code model text for general reference. Local amendments vary. It is not a substitute for the adopted code enforced by your authority having jurisdiction. See the jurisdiction pages for the edition a city has adopted, and scan the plan set before you rely on a result. A cell marked provisional was not confirmed from the model-code text and should not be used until you check the printed table.